Gate four is transition and the primary questions answered in this phase address ownership of the system and training of key personnel.

A) True
B) False

Correct Answer

verifed

verified

What measures how well the solution will be accepted in a given opportunity?


A) Political feasibility
B) Operational feasibility
C) Schedule feasibility
D) Legal feasibility

E) C) and D)
F) All of the above

Correct Answer

verifed

verified

Process modeling illustrates the movement of information between external entities and the processes and data stores within the system.

A) True
B) False

Correct Answer

verifed

verified

Onshore outsourcing occurs when contracting an outsourcing arrangement with a company in a nearby country. Often this country will share a border with the native country.

A) True
B) False

Correct Answer

verifed

verified

Scrum methodology, uses small teams to produce small pieces of software using a series of "sprints," or 30-day intervals, to achieve an appointed goal.

A) True
B) False

Correct Answer

verifed

verified

Which gate is inception?


A) Gate one
B) Gate two
C) Gate three
D) Gate four

E) A) and C)
F) B) and C)

Correct Answer

verifed

verified

Summarize the different software development methodologies.

Correct Answer

verifed

verified

There are a number of different software...

View Answer

What is a technique for generating ideas by encouraging participants to offer as many ideas as possible in a short period without any analysis until all the ideas have been exhausted?


A) Brainstorming
B) Change agent
C) Test conditions
D) Bugs

E) None of the above
F) A) and B)

Correct Answer

verifed

verified

It is important to understand that SOA is not a concrete architecture; it is thought that leads to a concrete architecture. It might be described as a style, paradigm, concept, perspective, philosophy, or representation. That is, SOA is an approach, a way of thinking, a value system that leads to decisions that design a concrete architecture allowing enterprises to plug in new services or upgrade existing services in a granular approach.

A) True
B) False

Correct Answer

verifed

verified

Exception reports organize and categorize data for managerial perusal.

A) True
B) False

Correct Answer

verifed

verified

Project assumptions represent key dates when a certain group of activities must be performed.

A) True
B) False

Correct Answer

verifed

verified

What is loose coupling?


A) A business-driven enterprise architecture that supports integrating a business as linked, repeatable activities, tasks, or services.
B) A business task.
C) The capability of services to be joined together on demand to create composite services, or disassembled just as easily into their functional component.
D) The capability of two or more computer systems to share data and resources, even though they are made by different manufacturers.

E) A) and B)
F) All of the above

Correct Answer

verifed

verified

Control objects for information and related technology (COBIT) are software suites that automate systems analysis, design, and development.

A) True
B) False

Correct Answer

verifed

verified

Scripting languages group data and corresponding processes into objects.

A) True
B) False

Correct Answer

verifed

verified

Project scope statement links the project to the organization's overall business goals. It describes the business need (the problem the project will solve) and the justification, requirements, and current boundaries for the project.

A) True
B) False

Correct Answer

verifed

verified

The scrum methodology uses small teams to produce small pieces of software using a series of sprints, or 30-day intervals, to achieve an appointed goal.

A) True
B) False

Correct Answer

verifed

verified

Which gate is transition?


A) Gate one
B) Gate two
C) Gate three
D) Gate four

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

SOA promotes a scalable and flexible enterprise architecture that can implement new or reuse existing MIS components, creating connections among disparate applications and systems.

A) True
B) False

Correct Answer

verifed

verified

What is the analysis phase in the SDLC?


A) Involves establishing a high-level plan of the intended project and determining project goals
B) Involves analyzing end-user business requirements and refining project goals into defined functions and operations of the intended system
C) Involves describing the desired features and operations of the system
D) Involves placing the system into production so users can begin to perform actual business operations with the system

E) A) and D)
F) C) and D)

Correct Answer

verifed

verified

Pilot implementation is a small group of people use the new system until it is verified that it works correctly then the remaining users migrate.

A) True
B) False

Correct Answer

verifed

verified