A) unit testing
B) development testing
C) integration testing
D) user acceptance testing
Correct Answer
verified
Multiple Choice
A) corrective maintenance
B) preventative maintenance
C) pilot implementation
D) phased implementation
Correct Answer
verified
Multiple Choice
A) an illustration of the movement of information between external entities and the processes and data stores within the system
B) software suites that automate systems analysis, design, and development
C) a formal, approved document that manages and controls the entire project
D) a graphical representation of the processes that capture, manipulate, store, and distribute information between a system and its environment
Correct Answer
verified
Multiple Choice
A) parallel implementation
B) plunge implementation
C) pilot implementation
D) phased implementation
Correct Answer
verified
Multiple Choice
A) an individual who is an expert in project planning and management, defines and develops the project plan, and tracks the plan to ensure that the project is completed on time and on budget
B) a description of the business need (the problem the project will solve) and the justification, requirements, and current boundaries for the project
C) a formal, approved document that manages and controls the entire project
D) a graphical representation of the processes that capture, manipulate, store, and distribute information between a system and its environment
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) project objectives
B) project constraints
C) project assumptions
D) project deliverable
Correct Answer
verified
Multiple Choice
A) in-sourcing
B) outsourcing
C) business process outsourcing
D) offshore outsourcing
Correct Answer
verified
Multiple Choice
A) RAD methodology
B) agile methodology
C) waterfall methodology
D) extreme programming
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) measures the cost-effectiveness of a project
B) measures how well a solution meets the identified system requirements to solve the problems and take advantage of opportunities
C) measures the project time frame to ensure that it can be completed on time
D) measures the practicality of a technical solution and the availability of technical resources and expertise
Correct Answer
verified
Multiple Choice
A) inception
B) elaboration
C) construction
D) transition
Correct Answer
verified
Multiple Choice
A) in-sourcing
B) outsourcing
C) business process outsourcing
D) offshore outsourcing
Correct Answer
verified
Multiple Choice
A) the path from resource to task that passes through all critical components of a project plan
B) the path between tasks to the project's finish that passes through all critical components of a project plan
C) the sequence of activities that determine the earliest date by which the project can be completed
D) the path from start to finish that passes through all the tasks that are critical to completing the project in the longest amount of time
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) delivered on time
B) delivered within budget
C) meets the business's requirements
D) All of these are correct.
Correct Answer
verified
Multiple Choice
A) parallel implementation
B) plunge implementation
C) pilot implementation
D) phased implementation
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) inception
B) elaboration
C) construction
D) transition
Correct Answer
verified
Multiple Choice
A) fast and efficient
B) small and nimble
C) lower cost
D) All of these are correct.
Correct Answer
verified
Showing 41 - 60 of 311