Which of the following does a project manager perform?


A) Defines and develops the project plan
B) Tracks the plan to ensure all key project milestones are completed on time
C) Expert in project planning and management
D) All the answers are correct

E) A) and C)
F) A) and B)

Correct Answer

verifed

verified

The prototype is an essential part of the analysis phase when using which methodology?


A) Scrum
B) XP
C) RAP
D) RAD

E) A) and D)
F) A) and C)

Correct Answer

verifed

verified

Describe the seven phases of the systems development life cycle.

Correct Answer

verifed

verified

The planning phase involves establishing...

View Answer

The implementation phase involves taking all of the detailed design documents from the design phase and transforming them into the actual system.

A) True
B) False

Correct Answer

verifed

verified

What are project constraints?


A) Specific factors that can limit options
B) Factors that are considered to be true, real, or certain without proof or demonstration
C) Quantifiable criteria that must be met for the project to be considered a success
D) A document issued by the project initiator or sponsor that formally authorises the existence of a project and provides the project manager with the authority to apply organisational resources to project activities

E) C) and D)
F) B) and C)

Correct Answer

verifed

verified

Preventing liabilities is a business-related consequence of failed software.

A) True
B) False

Correct Answer

verifed

verified

An organisation must identify what it wants to do and how it is going to do it.What does the 'how' part of this question focus on?


A) Justification of the project
B) Definition of the project
C) Analysis of project risks
D) Expected results of the project

E) None of the above
F) C) and D)

Correct Answer

verifed

verified

What is the systems development life cycle (SDLC) ?


A) Involves establishing a high-level plan of the intended project and determining project goals
B) Involves analysing end-user business requirements and refining project goals into defined functions and operations of the intended system
C) Involves describing the desired features and operations of the system
D) The overall process for developing information systems from planning and analysis through implementation and maintenance

E) A) and B)
F) All of the above

Correct Answer

verifed

verified

A prototype is a smaller-scale representation or working model of the users' requirements or a proposed design for an information system.

A) True
B) False

Correct Answer

verifed

verified

All of the following are challenges of outsourcing,except:


A) Contract length
B) Competitive edge
C) Confidentiality
D) Reduced frustration and expense related to hiring and retaining employees in an exceptionally tight job market

E) B) and C)
F) A) and D)

Correct Answer

verifed

verified

What is a business requirement?


A) The non-specific business requests the system must meet to be successful
B) The specific business requests the system must meet to be successful
C) The non-specific methodology the system must meet to be successful
D) The specific methodology the system must meet to be successful

E) A) and B)
F) A) and D)

Correct Answer

verifed

verified

Which of the following is an outsourcing challenge caused by contract length?


A) Difficulties in getting out of a contract
B) Problems in foreseeing future issues
C) Problems in re-forming an internal IT department
D) All the answers are correct

E) A) and C)
F) All of the above

Correct Answer

verifed

verified

What development style consists of a series of tiny projects?


A) Waterfall methodology
B) Iterative development
C) Agile methodology
D) All the answers are correct

E) A) and C)
F) None of the above

Correct Answer

verifed

verified

Project milestones are any measurable,tangible,verifiable outcome,result or item that is produced to complete a project or part of a project.

A) True
B) False

Correct Answer

verifed

verified

Explain project management and the role the triple constraints play when managing a project.

Correct Answer

verifed

verified

Project management is the application of...

View Answer

What is the application of knowledge,skills,tools and techniques to project activities to meet project requirements?


A) Project management
B) Project management software
C) Scope
D) None of above

E) All of the above
F) None of the above

Correct Answer

verifed

verified

Which of the following is a benefit an organisation can receive from outsourcing?


A) Financial savings
B) Increase technical abilities
C) Market agility
D) All the answers are correct

E) B) and D)
F) A) and B)

Correct Answer

verifed

verified

Which methodology ends or begins each day with a stand-up meeting to monitor and control the development effort?


A) Scrum
B) XP
C) RUP
D) RAD

E) A) and D)
F) None of the above

Correct Answer

verifed

verified

What are the three primary variables (or triple constraints) in any project?


A) Time, cost, expense
B) Time, expense, requirements
C) Time, cost, scope
D) Time, cost, quality

E) B) and C)
F) A) and D)

Correct Answer

verifed

verified

The traditional waterfall methodology is a sequential,activity-based process in which each phase in the SDLC is performed sequentially from planning through implementation and maintenance.

A) True
B) False

Correct Answer

verifed