Correct Answer
verified
Multiple Choice
A) Gate one
B) Gate two
C) Gate three
D) Gate four
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) In-sourcing
B) Outsourcing
C) Business process outsourcing
D) Offshore outsourcing
Correct Answer
verified
Multiple Choice
A) Quantifiable criteria that must be met for the project to be considered a success
B) Products,services,or processes that are not specifically a part of the project
C) Any measurable,tangible,verifiable outcome,result or item that is produced to complete a project or part of a project
D) Defines the work that must be completed to deliver a product with the specified features and functions
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) Economic feasibility
B) Operational feasibility
C) Schedule feasibility
D) Technical feasibility
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) Justification of the project
B) Definition of the project
C) Expected results of the project
D) All of these choices
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) Measures how well the solution will be accepted in a given opportunity
B) Measures how well a solution can be implemented within existing legal and contractual obligations
C) Measures the project time frame to ensure that it can be completed on time
D) Measures the practicality of a technical solution and the availability of technical resources and expertise
Correct Answer
verified
Multiple Choice
A) Specific factors that can limit options
B) Factors that are considered to be true,real,or certain without proof or demonstration
C) Quantifiable criteria that must be met for the project to be considered a success
D) A document issued by the project initiator or sponsor that formally authorizes the existence of a project and provides the project manager with the authority to apply organizational resources to project activities
Correct Answer
verified
Multiple Choice
A) The path from resource to task that passes through all critical components of a project plan
B) The path between tasks to the projects finish that passes through all critical components of a project plan
C) The sequence of activities that determine the earliest date by which the project can be completed
D) The path from start to finish that passes through all the tasks that are critical to completing the project in the longest amount of time
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) Gate one
B) Gate two
C) Gate three
D) Gate four
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) Scrum
B) XP
C) RUP
D) RAD
Correct Answer
verified
Multiple Choice
A) Alpha testing
B) Development testing
C) Integration testing
D) System testing
Correct Answer
verified
Multiple Choice
A) Analysis phase
B) Design phase
C) Development phase
D) Testing phase
Correct Answer
verified