_________ is an arrangement by which one organization provides a service or services for another organization that chooses not to perform them in-house.

Correct Answer

verifed

verified

User acceptance testing (UAT)determines if the system satisfies the user and business requirements.

A) True
B) False

Correct Answer

verifed

verified

In the past,outsourcing was often used tactically,as a quick-fix,short-term solution to a particular need or problem which did not form part of an overall business strategy.

A) True
B) False

Correct Answer

verifed

verified

What is a technique for generating ideas by encouraging participants to offer as many ideas as possible in a short period without any analysis until all the ideas have been exhausted?


A) Brainstorming
B) Change agent
C) Test conditions
D) Bugs

E) A) and B)
F) None of the above

Correct Answer

verifed

verified

Which reports present data that is distributed inside the organization and is intended for employees within an organization?


A) Internal reports
B) Detailed internal reports
C) Summary internal reports
D) Exception reports

E) None of the above
F) A) and B)

Correct Answer

verifed

verified

Information systems __________ reports assess a company's information system to determine necessary changes and to help ensure the information systems' availability,confidentiality,and integrity.

Correct Answer

verifed

verified

Unit testing uses both the legacy system and new system until all users verifies that the new system functions correctly.

A) True
B) False

Correct Answer

verifed

verified

What is a simple bar chart that depicts project tasks against a calendar?


A) Gantt chart
B) PERT chart
C) Dependency
D) All of the above

E) A) and C)
F) A) and D)

Correct Answer

verifed

verified

Project constraints are factors considered to be true,real,or certain without proof or demonstration.

A) True
B) False

Correct Answer

verifed

verified

What is a set of best practices that helps an organization to maximize the benefits of an information system,while at the same time establishing appropriate controls to ensure minimum errors?


A) COBIT
B) CASE
C) IEEE
D) All of the above

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

What is a business requirement?


A) The nonspecific business requests the system must meet to be successful
B) The specific business requests the system must meet to be successful
C) The nonspecific methodology the system must meet to be successful
D) The specific methodology the system must meet to be successful

E) None of the above
F) C) and D)

Correct Answer

verifed

verified

Which of the following is not a characteristic of a well-defined project plan?


A) Prepared by the project manager
B) Easy to read
C) Appropriate to the project's size
D) Communicated to all key participants

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

The project requirements document defines the specifications for product/output of the project and is key for managing expectations,controlling scope,and completing other planning efforts.

A) True
B) False

Correct Answer

verifed

verified

Project ____________ represent key dates when a certain group of activities must be performed.

Correct Answer

verifed

verified

Milestones...

View Answer

What is a group of people who respond to users questions?


A) Online training
B) Workshop training
C) Help desk
D) Corrective maintenance

E) B) and D)
F) A) and C)

Correct Answer

verifed

verified

Which methodology ends each day or begins with a stand-up meeting to monitor and control the development effort?


A) Scrum
B) XP
C) RUP
D) RAD

E) A) and B)
F) B) and D)

Correct Answer

verifed

verified

What are project assumptions?


A) Specific factors that can limit options
B) Factors that are considered to be true,real,or certain without proof or demonstration
C) Quantifiable criteria that must be met for the project to be considered a success
D) A document issued by the project initiator or sponsor that formally authorizes the existence of a project and provides the project manager with the authority to apply organizational resources to project activities

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

What is the most important part of the project plan?


A) Gantt chart
B) Specification
C) Communication
D) None of the above

E) All of the above
F) A) and D)

Correct Answer

verifed

verified

Project objectives are quantifiable criteria that must be met for the project to be considered a success.

A) True
B) False

Correct Answer

verifed

verified

A dependency is a logical relationship that exists between the project tasks,or between a project task and a milestone.

A) True
B) False

Correct Answer

verifed

verified