What do SMART criteria for successful objective creation include?


A) Specific,metrics,agreed upon,real,time valued
B) Specific,measurable,agreed upon,realistic,time framed
C) Specific,measurable,accurate,real,time valued
D) Specific,metrics,agreed upon,realistic,time framed

E) All of the above
F) C) and D)

Correct Answer

verifed

verified

________________ testing occurs when programmers test the system to ensure it is bug-free.

Correct Answer

verifed

verified

What is held in a classroom environment and led by an instructor?


A) Online training
B) Workshop training
C) Help desk
D) Corrective maintenance

E) C) and D)
F) A) and C)

Correct Answer

verifed

verified

The ______________ phase establishes descriptions of the desired features and operations of the system including screen layouts,business rules,process diagrams,pseudo code,and other documentation.

Correct Answer

verifed

verified

What are project constraints?


A) Specific factors that can limit options
B) Factors that are considered to be true,real,or certain without proof or demonstration
C) Quantifiable criteria that must be met for the project to be considered a success
D) A document issued by the project initiator or sponsor that formally authorizes the existence of a project and provides the project manager with the authority to apply organizational resources to project activities

E) A) and B)
F) A) and D)

Correct Answer

verifed

verified

Workshop training is held in a classroom environment and led by an instructor.

A) True
B) False

Correct Answer

verifed

verified

What is the process of transferring information from a legacy system to a new system?


A) COBIT
B) Conversion
C) Business requirements
D) Sign-off

E) All of the above
F) A) and B)

Correct Answer

verifed

verified

Which document prioritizes all of the business requirements by order of importance to the company?


A) Requirements documentation
B) Requirements management
C) Requirements definition document
D) All of the above

E) A) and D)
F) None of the above

Correct Answer

verifed

verified

Which of the following is an issue related to the waterfall methodology?


A) Flaws in accurately defining and articulating the business problem
B) Managing costs,resources,and time constraints
C) Assumes users can specify all business requirements in advance
D) All of the above

E) B) and D)
F) A) and C)

Correct Answer

verifed

verified

The testing phase takes all the detailed design documents from the design phase and transforms them into the actual system.

A) True
B) False

Correct Answer

verifed

verified

An organization must identify what it wants to do and how it is going to do it.What does the "how" part of this question focus on?


A) Justification of the project
B) Definition of the project
C) Analysis of project risks
D) Expected results of the project

E) B) and D)
F) B) and C)

Correct Answer

verifed

verified

Project ______________ are specific factors that can limit options including budget,delivery dates,available skilled resources,and organizational policies.

Correct Answer

verifed

verified

The implementation phase involves taking all of the detailed design documents from the design phase and transforming them into the actual system.

A) True
B) False

Correct Answer

verifed

verified

_____________ implementation is a small group of people use the new system until it is verified that it works correctly then the remaining users migrate.

Correct Answer

verifed

verified

What is the overall process for developing information systems from planning and analysis through implementation and maintenance?


A) Systems development life cycle
B) Project management
C) Systems management
D) Project development life cycle

E) B) and C)
F) A) and B)

Correct Answer

verifed

verified

Information system control reports ensure the reliability of information,consisting of policies and their physical implementation,access restrictions,or recordkeeping of actions and transactions.

A) True
B) False

Correct Answer

verifed

verified

Which implementation discards the legacy system completely and immediately migrates all users to the new system?


A) Parallel implementation
B) Plunge implementation
C) Pilot implementation
D) Phased implementation

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

A project objective is any measurable,tangible,verifiable outcome,result,or item that is produced to complete a project or part of a project.

A) True
B) False

Correct Answer

verifed

verified

In the __________ phase the firm analyzes its end-user business requirements and refines project goals into defined functions and operations of the intended system.

Correct Answer

verifed

verified

What is a graphical network model that depicts a project's tasks and the relationships between those tasks?


A) Gantt chart
B) PERT chart
C) Dependency
D) All of the above

E) None of the above
F) All of the above

Correct Answer

verifed

verified