In activity-based costing, an activity can involve several related tasks.

A) True
B) False

Correct Answer

verifed

verified

Activity-based costing first assigns costs to products and then uses these product costs to assign costs to manufacturing activities.

A) True
B) False

Correct Answer

verifed

verified

Explain cost flows for the plantwide overhead rate method.

Correct Answer

verifed

verified

The plantwide overhead rate me...

View Answer

ABC allocates overhead costs to products based on input measures rather than output measures.

A) True
B) False

Correct Answer

verifed

verified

Which types of overhead allocation methods result in the use of more than one overhead rate during the same time period?


A) Plantwide overhead rate method and departmental overhead rate method.
B) Cost pool overhead rate method and plantwide overhead rate method.
C) Departmental overhead rate method and activity-based costing.
D) Activity-based costing and plantwide overhead rate method.
E) Departmental overhead rate method and cost pool overhead rate method.

F) D) and E)
G) C) and D)

Correct Answer

verifed

verified

The cost object(s) of the departmental overhead rate method is:


A) The unit of product.
B) The production departments of the company.
C) The production departments in the first stage and the unit of product in the second stage.
D) The unit of product in the first stage and the production departments in the second stage.
E) The production activities of the company.

F) B) and D)
G) A) and C)

Correct Answer

verifed

verified

Over recent decades, overhead costs have steadily decreased while direct labor costs have increased as a percentage of total manufacturing costs.

A) True
B) False

Correct Answer

verifed

verified

A company estimates total overhead costs for the next year to be $1,200,000 and wishes to use direct labor hours as its overhead allocation base. This company makes two products: (1) Fancy X, which requires three direct labor hours per unit, and (2) Plain X, which requires one direct labor hour per unit. If the company plans to make 10,000 units of Fancy X and 10,000 units of Plain X, then each unit produced will be allocated the same amount of overhead.

A) True
B) False

Correct Answer

verifed

verified

Kamper Company sells two products Big Z and Little Z. Current direct material and direct labor costs are detailed below. Next year, the company wishes to use a plantwide overhead rate with direct labor hours as its allocation base. Next year's overhead is estimated to be $475,000. The direct labor and direct materials costs are estimated to be consistent with the current year. Direct labor costs $20 per hour and the company expects to manufacture 32,000 units of Big Z and 9,000 units of Little Z next year. Kamper Company sells two products Big Z and Little Z. Current direct material and direct labor costs are detailed below. Next year, the company wishes to use a plantwide overhead rate with direct labor hours as its allocation base. Next year's overhead is estimated to be $475,000. The direct labor and direct materials costs are estimated to be consistent with the current year. Direct labor costs $20 per hour and the company expects to manufacture 32,000 units of Big Z and 9,000 units of Little Z next year.   What are total estimated direct labor hours for this next year? A)  30,800 total DLH. B)  616,000 total DLH. C)  300,000 total DLH. D)  1,025,000 total DLH. E)  916,000 total DLH. What are total estimated direct labor hours for this next year?


A) 30,800 total DLH.
B) 616,000 total DLH.
C) 300,000 total DLH.
D) 1,025,000 total DLH.
E) 916,000 total DLH.

F) D) and E)
G) A) and D)

Correct Answer

verifed

verified

The ________ overhead rate method uses multiple volume-based measures to allocate overhead costs to products.

Correct Answer

verifed

verified

A ________ overhead rate is a single overhead rate determined by using volume-related measures.

Correct Answer

verifed

verified

Name and briefly describe three overhead rate methods.

Correct Answer

verifed

verified

The plantwide overhead rate method uses ...

View Answer

The major advantages of using a single plantwide overhead rate are ________ and ________.

Correct Answer

verifed

verified

readily available in...

View Answer

The cost object(s) of the activity-based costing method is(are) :


A) The unit of product.
B) The production departments of the company.
C) The production activities of the company.
D) The production activities in the first stage and the unit of product in the second stage.
E) The unit of product in the first stage and the production activities in the second stage.

F) A) and E)
G) A) and B)

Correct Answer

verifed

verified

Allocated overhead ________ vary depending upon the allocation method used.

Correct Answer

verifed

verified

Compute Tasty's departmental overhead rate for the mixing department based on machine hours.


A) $1.50 per MH.
B) $3.33 per MH.
C) $0.60 per MH.
D) $0.50 per MH.
E) $2.00 per MH.

F) A) and D)
G) B) and E)

Correct Answer

verifed

verified

Batch-level costs vary with the number of units produced.

A) True
B) False

Correct Answer

verifed

verified

A company produces heating elements that go through two operations, casting and assembling, before they are complete. Expected costs and activities for the two departments are shown below. Given this information, the departmental overhead rate for the assembling department based on direct labor hours is $5 per direct labor hour. A company produces heating elements that go through two operations, casting and assembling, before they are complete. Expected costs and activities for the two departments are shown below. Given this information, the departmental overhead rate for the assembling department based on direct labor hours is $5 per direct labor hour.

A) True
B) False

Correct Answer

verifed

verified

Compute Tasty's departmental overhead rate for the mixing department based on direct labor hours.


A) $1.50 per DLH.
B) $5.00 per DLH.
C) $0.75 per DLH.
D) $0.60 per DLH.
E) $1.67 per DLH.

F) A) and D)
G) C) and D)

Correct Answer

verifed

verified

The premise of ABC is that it takes ________ to make products and provide services.

Correct Answer

verifed

verified