The unit product cost of Product Q9 under activity-based costing is closest to:


A) $628.67 per unit
B) $444.68 per unit
C) $641.50 per unit
D) $570.33 per unit

E) B) and D)
F) C) and D)

Correct Answer

verifed

verified

The unit product cost of Product A4 under activity-based costing is closest to:


A) $1,168.26 per unit
B) $1,381.41 per unit
C) $1,307.76 per unit
D) $784.69 per unit

E) None of the above
F) A) and B)

Correct Answer

verifed

verified

Desjarlais Corporation uses the following activity rates from its activity-based costing to assign overhead costs to products. Desjarlais Corporation uses the following activity rates from its activity-based costing to assign overhead costs to products.   Data concerning two products appear below:   Required: a.How much overhead cost would be assigned to Product S96U using the company's activity-based costing system? Show your work! b.How much overhead cost would be assigned to Product Q06F using the company's activity-based costing system? Show your work! Data concerning two products appear below: Desjarlais Corporation uses the following activity rates from its activity-based costing to assign overhead costs to products.   Data concerning two products appear below:   Required: a.How much overhead cost would be assigned to Product S96U using the company's activity-based costing system? Show your work! b.How much overhead cost would be assigned to Product Q06F using the company's activity-based costing system? Show your work! Required: a.How much overhead cost would be assigned to Product S96U using the company's activity-based costing system? Show your work! b.How much overhead cost would be assigned to Product Q06F using the company's activity-based costing system? Show your work!

Correct Answer

verifed

verified

a.Product S96U blured image_TB26...

View Answer

Seldomridge, Inc., manufactures and sells two products: Product I5 and Product U0.Data concerning the expected production of each product and the expected total direct labor-hours (DLHs) required to produce that output appear below: Seldomridge, Inc., manufactures and sells two products: Product I5 and Product U0.Data concerning the expected production of each product and the expected total direct labor-hours (DLHs) required to produce that output appear below:   The direct labor rate is $24.40 per DLH.The direct materials cost per unit for each product is given below:   The company is considering adopting an activity-based costing system with the following activity cost pools, activity measures, and expected activity:   The unit product cost of Product U0 under activity-based costing is closest to: A) $1,672.35 per unit B) $2,504.73 per unit C) $2,042.50 per unit D) $2,885.25 per unit The direct labor rate is $24.40 per DLH.The direct materials cost per unit for each product is given below: Seldomridge, Inc., manufactures and sells two products: Product I5 and Product U0.Data concerning the expected production of each product and the expected total direct labor-hours (DLHs) required to produce that output appear below:   The direct labor rate is $24.40 per DLH.The direct materials cost per unit for each product is given below:   The company is considering adopting an activity-based costing system with the following activity cost pools, activity measures, and expected activity:   The unit product cost of Product U0 under activity-based costing is closest to: A) $1,672.35 per unit B) $2,504.73 per unit C) $2,042.50 per unit D) $2,885.25 per unit The company is considering adopting an activity-based costing system with the following activity cost pools, activity measures, and expected activity: Seldomridge, Inc., manufactures and sells two products: Product I5 and Product U0.Data concerning the expected production of each product and the expected total direct labor-hours (DLHs) required to produce that output appear below:   The direct labor rate is $24.40 per DLH.The direct materials cost per unit for each product is given below:   The company is considering adopting an activity-based costing system with the following activity cost pools, activity measures, and expected activity:   The unit product cost of Product U0 under activity-based costing is closest to: A) $1,672.35 per unit B) $2,504.73 per unit C) $2,042.50 per unit D) $2,885.25 per unit The unit product cost of Product U0 under activity-based costing is closest to:


A) $1,672.35 per unit
B) $2,504.73 per unit
C) $2,042.50 per unit
D) $2,885.25 per unit

E) None of the above
F) B) and C)

Correct Answer

verifed

verified

The overhead cost per unit of Product B is closest to:


A) $25.90
B) $11.49
C) $34.73
D) $48.09

E) A) and C)
F) None of the above

Correct Answer

verifed

verified

The overhead applied to each unit of Product H9 under activity-based costing is closest to:


A) $1,139.60 per unit
B) $1,078.98 per unit
C) $610.09 per unit
D) $1,025.67 per unit

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

Activity rates from Mcelderry Corporation's activity-based costing system are listed below.The company uses the activity rates to assign overhead costs to products: Activity rates from Mcelderry Corporation's activity-based costing system are listed below.The company uses the activity rates to assign overhead costs to products:   Last year, Product Q06J involved 10 customer orders, 580 assembly hours, and 12 batches.How much overhead cost would be assigned to Product Q06J using the activity-based costing system? A) $71.01 B) $219.12 C) $2,388.22 D) $42,748.02 Last year, Product Q06J involved 10 customer orders, 580 assembly hours, and 12 batches.How much overhead cost would be assigned to Product Q06J using the activity-based costing system?


A) $71.01
B) $219.12
C) $2,388.22
D) $42,748.02

E) A) and D)
F) A) and B)

Correct Answer

verifed

verified

The activity rate for the Labor-Related activity cost pool under activity-based costing is closest to:


A) $43.15 per DLH
B) $635.33 per DLH
C) $57.77 per DLH
D) $80.88 per DLH

E) A) and C)
F) A) and B)

Correct Answer

verifed

verified

Graise, Inc., manufactures and sells two products: Product C2 and Product M5.Data concerning the expected production of each product and the expected total direct labor-hours (DLHs)required to produce that output appear below: Graise, Inc., manufactures and sells two products: Product C2 and Product M5.Data concerning the expected production of each product and the expected total direct labor-hours (DLHs)required to produce that output appear below:   The direct labor rate is $22.50 per DLH.The direct materials cost per unit is $124.20 for Product C2 and $144.00 for Product M5.  The company has an activity-based costing system with the following activity cost pools, activity measures, and expected activity:   Required: In all computations involving dollars in the following requirements, round off your answer to the nearest whole cent. a.Compute the activity rates under the activity-based costing system. b.Determine how much overhead would be assigned to each product under the activity-based costing system. c.Determine the unit product cost of each product under the activity-based costing method. The direct labor rate is $22.50 per DLH.The direct materials cost per unit is $124.20 for Product C2 and $144.00 for Product M5. The company has an activity-based costing system with the following activity cost pools, activity measures, and expected activity: Graise, Inc., manufactures and sells two products: Product C2 and Product M5.Data concerning the expected production of each product and the expected total direct labor-hours (DLHs)required to produce that output appear below:   The direct labor rate is $22.50 per DLH.The direct materials cost per unit is $124.20 for Product C2 and $144.00 for Product M5.  The company has an activity-based costing system with the following activity cost pools, activity measures, and expected activity:   Required: In all computations involving dollars in the following requirements, round off your answer to the nearest whole cent. a.Compute the activity rates under the activity-based costing system. b.Determine how much overhead would be assigned to each product under the activity-based costing system. c.Determine the unit product cost of each product under the activity-based costing method. Required: In all computations involving dollars in the following requirements, round off your answer to the nearest whole cent. a.Compute the activity rates under the activity-based costing system. b.Determine how much overhead would be assigned to each product under the activity-based costing system. c.Determine the unit product cost of each product under the activity-based costing method.

Correct Answer

verifed

verified

a.Computation of activity rates: blured image_TB2627...

View Answer

Privott, Inc., manufactures and sells two products: Product Z9 and Product N0.The company is considering adopting an activity-based costing system with the following activity cost pools, activity measures, and expected activity: Privott, Inc., manufactures and sells two products: Product Z9 and Product N0.The company is considering adopting an activity-based costing system with the following activity cost pools, activity measures, and expected activity:   The activity rate for the Labor-Related activity cost pool under activity-based costing is closest to: A) $91.49 per DLH B) $934.30 per DLH C) $114.37 per DLH D) $34.47 per DLH The activity rate for the Labor-Related activity cost pool under activity-based costing is closest to:


A) $91.49 per DLH
B) $934.30 per DLH
C) $114.37 per DLH
D) $34.47 per DLH

E) None of the above
F) B) and C)

Correct Answer

verifed

verified

The overhead applied to each unit of Product X2 under activity-based costing is closest to:


A) $2,082.89 per unit
B) $2,186.02 per unit
C) $2,964.58 per unit
D) $1,837.85 per unit

E) C) and D)
F) A) and C)

Correct Answer

verifed

verified

In activity-based costing, unit product costs computed for external financial reports include:


A) direct materials and manufacturing overhead.
B) direct labor and manufacturing overhead.
C) direct materials, direct labor, and manufacturing overhead.
D) direct materials and direct labor.

E) A) and D)
F) A) and C)

Correct Answer

verifed

verified

The activity rate for the Labor-Related activity cost pool under activity-based costing is closest to:


A) $141.07 per DLH
B) $235.12 per DLH
C) $33.06 per DLH
D) $697.35 per DLH

E) B) and C)
F) A) and C)

Correct Answer

verifed

verified

Weiskopf, Inc., manufactures and sells two products: Product E6 and Product J2.Data concerning the expected production of each product and the expected total direct labor-hours (DLHs) required to produce that output appear below: Weiskopf, Inc., manufactures and sells two products: Product E6 and Product J2.Data concerning the expected production of each product and the expected total direct labor-hours (DLHs) required to produce that output appear below:   The direct labor rate is $18.10 per DLH.The direct materials cost per unit for each product is given below:   The company is considering adopting an activity-based costing system with the following activity cost pools, activity measures, and expected activity:   Which of the following statements concerning the unit product cost of Product J2 is true? A) The unit product cost of Product J2 under traditional costing is less than its unit product cost under activity-based costing by $101.07. B) The unit product cost of Product J2 under traditional costing is greater than its unit product under activity-based costing by $101.07. C) The unit product cost of Product J2 under traditional costing is greater than its unit product under activity-based costing by $42.54. D) The unit product cost of Product J2 under traditional costing is less than its unit product cost under activity-based costing by $42.54. The direct labor rate is $18.10 per DLH.The direct materials cost per unit for each product is given below: Weiskopf, Inc., manufactures and sells two products: Product E6 and Product J2.Data concerning the expected production of each product and the expected total direct labor-hours (DLHs) required to produce that output appear below:   The direct labor rate is $18.10 per DLH.The direct materials cost per unit for each product is given below:   The company is considering adopting an activity-based costing system with the following activity cost pools, activity measures, and expected activity:   Which of the following statements concerning the unit product cost of Product J2 is true? A) The unit product cost of Product J2 under traditional costing is less than its unit product cost under activity-based costing by $101.07. B) The unit product cost of Product J2 under traditional costing is greater than its unit product under activity-based costing by $101.07. C) The unit product cost of Product J2 under traditional costing is greater than its unit product under activity-based costing by $42.54. D) The unit product cost of Product J2 under traditional costing is less than its unit product cost under activity-based costing by $42.54. The company is considering adopting an activity-based costing system with the following activity cost pools, activity measures, and expected activity: Weiskopf, Inc., manufactures and sells two products: Product E6 and Product J2.Data concerning the expected production of each product and the expected total direct labor-hours (DLHs) required to produce that output appear below:   The direct labor rate is $18.10 per DLH.The direct materials cost per unit for each product is given below:   The company is considering adopting an activity-based costing system with the following activity cost pools, activity measures, and expected activity:   Which of the following statements concerning the unit product cost of Product J2 is true? A) The unit product cost of Product J2 under traditional costing is less than its unit product cost under activity-based costing by $101.07. B) The unit product cost of Product J2 under traditional costing is greater than its unit product under activity-based costing by $101.07. C) The unit product cost of Product J2 under traditional costing is greater than its unit product under activity-based costing by $42.54. D) The unit product cost of Product J2 under traditional costing is less than its unit product cost under activity-based costing by $42.54. Which of the following statements concerning the unit product cost of Product J2 is true?


A) The unit product cost of Product J2 under traditional costing is less than its unit product cost under activity-based costing by $101.07.
B) The unit product cost of Product J2 under traditional costing is greater than its unit product under activity-based costing by $101.07.
C) The unit product cost of Product J2 under traditional costing is greater than its unit product under activity-based costing by $42.54.
D) The unit product cost of Product J2 under traditional costing is less than its unit product cost under activity-based costing by $42.54.

E) A) and C)
F) A) and B)

Correct Answer

verifed

verified

When a company changes from a traditional costing system to an activity-based costing system, the unit product costs of low-volume products typically increase more than the unit product costs of high-volume products decrease.

A) True
B) False

Correct Answer

verifed

verified

Rondeau, Inc., manufactures and sells two products: Product V9 and Product M6.Data concerning the expected production of each product and the expected total direct labor-hours (DLHs)required to produce that output appear below: Rondeau, Inc., manufactures and sells two products: Product V9 and Product M6.Data concerning the expected production of each product and the expected total direct labor-hours (DLHs)required to produce that output appear below:   The direct labor rate is $25.10 per DLH.The direct materials cost per unit for each product is given below:   The company is considering adopting an activity-based costing system with the following activity cost pools, activity measures, and expected activity:   Required: What is the difference between the unit product costs under the traditional costing method and the activity-based costing system for each of the two products? The direct labor rate is $25.10 per DLH.The direct materials cost per unit for each product is given below: Rondeau, Inc., manufactures and sells two products: Product V9 and Product M6.Data concerning the expected production of each product and the expected total direct labor-hours (DLHs)required to produce that output appear below:   The direct labor rate is $25.10 per DLH.The direct materials cost per unit for each product is given below:   The company is considering adopting an activity-based costing system with the following activity cost pools, activity measures, and expected activity:   Required: What is the difference between the unit product costs under the traditional costing method and the activity-based costing system for each of the two products? The company is considering adopting an activity-based costing system with the following activity cost pools, activity measures, and expected activity: Rondeau, Inc., manufactures and sells two products: Product V9 and Product M6.Data concerning the expected production of each product and the expected total direct labor-hours (DLHs)required to produce that output appear below:   The direct labor rate is $25.10 per DLH.The direct materials cost per unit for each product is given below:   The company is considering adopting an activity-based costing system with the following activity cost pools, activity measures, and expected activity:   Required: What is the difference between the unit product costs under the traditional costing method and the activity-based costing system for each of the two products? Required: What is the difference between the unit product costs under the traditional costing method and the activity-based costing system for each of the two products?

Correct Answer

verifed

verified

Predetermined overhead rate = Estimated ...

View Answer

If the company allocates all of its overhead based on direct labor-hours using its traditional costing method, the predetermined overhead rate would be closest to:


A) $38.80 per DLH
B) $36.95 per DLH
C) $97.10 per DLH
D) $107.88 per DLH

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

Upwall, Inc., manufactures and sells two products: Product S0 and Product F7.Data concerning the expected production of each product and the expected total direct labor-hours (DLHs)required to produce that output appear below: Upwall, Inc., manufactures and sells two products: Product S0 and Product F7.Data concerning the expected production of each product and the expected total direct labor-hours (DLHs)required to produce that output appear below:   The direct labor rate is $15.60 per DLH.The direct materials cost per unit for each product is given below:   The company is considering adopting an activity-based costing system with the following activity cost pools, activity measures, and expected activity:   Required: Determine the unit product cost of each product under the activity-based costing method. The direct labor rate is $15.60 per DLH.The direct materials cost per unit for each product is given below: Upwall, Inc., manufactures and sells two products: Product S0 and Product F7.Data concerning the expected production of each product and the expected total direct labor-hours (DLHs)required to produce that output appear below:   The direct labor rate is $15.60 per DLH.The direct materials cost per unit for each product is given below:   The company is considering adopting an activity-based costing system with the following activity cost pools, activity measures, and expected activity:   Required: Determine the unit product cost of each product under the activity-based costing method. The company is considering adopting an activity-based costing system with the following activity cost pools, activity measures, and expected activity: Upwall, Inc., manufactures and sells two products: Product S0 and Product F7.Data concerning the expected production of each product and the expected total direct labor-hours (DLHs)required to produce that output appear below:   The direct labor rate is $15.60 per DLH.The direct materials cost per unit for each product is given below:   The company is considering adopting an activity-based costing system with the following activity cost pools, activity measures, and expected activity:   Required: Determine the unit product cost of each product under the activity-based costing method. Required: Determine the unit product cost of each product under the activity-based costing method.

Correct Answer

verifed

verified

Computation of activity rates:...

View Answer

Parts administration is an example of a:


A) Unit-level activity.
B) Batch-level activity.
C) Product-level activity.
D) Facility-level activity.

E) B) and C)
F) A) and B)

Correct Answer

verifed

verified

Vescovi, Inc., manufactures and sells two products: Product N4 and Product W6.Data concerning the expected production of each product and the expected total direct labor-hours (DLHs)required to produce that output appear below: Vescovi, Inc., manufactures and sells two products: Product N4 and Product W6.Data concerning the expected production of each product and the expected total direct labor-hours (DLHs)required to produce that output appear below:   The direct labor rate is $16.20 per DLH.The direct materials cost per unit for each product is given below:   The company is considering adopting an activity-based costing system with the following activity cost pools, activity measures, and expected activity:   Required: What is the difference between the unit product costs under the traditional costing method and the activity-based costing system for each of the two products? The direct labor rate is $16.20 per DLH.The direct materials cost per unit for each product is given below: Vescovi, Inc., manufactures and sells two products: Product N4 and Product W6.Data concerning the expected production of each product and the expected total direct labor-hours (DLHs)required to produce that output appear below:   The direct labor rate is $16.20 per DLH.The direct materials cost per unit for each product is given below:   The company is considering adopting an activity-based costing system with the following activity cost pools, activity measures, and expected activity:   Required: What is the difference between the unit product costs under the traditional costing method and the activity-based costing system for each of the two products? The company is considering adopting an activity-based costing system with the following activity cost pools, activity measures, and expected activity: Vescovi, Inc., manufactures and sells two products: Product N4 and Product W6.Data concerning the expected production of each product and the expected total direct labor-hours (DLHs)required to produce that output appear below:   The direct labor rate is $16.20 per DLH.The direct materials cost per unit for each product is given below:   The company is considering adopting an activity-based costing system with the following activity cost pools, activity measures, and expected activity:   Required: What is the difference between the unit product costs under the traditional costing method and the activity-based costing system for each of the two products? Required: What is the difference between the unit product costs under the traditional costing method and the activity-based costing system for each of the two products?

Correct Answer

verifed

verified

Predetermined overhead rate = Estimated ...